When laying foundations using Blue Circle Cement, we recommend the following steps. This advice is designed to offer a general guide to help you create a strong and durable base for your patio.
2+ hours
Medium
Printer-friendly version
Safe working
Working safely on any project is the most important thing. Here are a few tips to keep you safe.
Ensure you have the 'hands-on' skills to take on the project
Always read the label on the product packaging before starting
Always follow the product safety guidance before starting
Ensure you have the correct protective clothing for the job
Always be visible in your workspace
Materials and tools required for this job:
Water
Shovel
Trowel
Spirit level
Concrete mixer (optional)
Wheelbarrow
String
Mallet
Wooden stakes
Bricks
Plastic sheeting
Safety gear
Online guide: How to lay foundations
Remember to follow safety guidelines and wear appropriate protective gear, including gloves and safety glasses, when working with cement. Additionally, always check and follow the specific instructions provided by the Blue Circle cement manufacturer. Using our guidance is your own responsibility.
Step 1
Site Preparation
Measure and mark out the area
where the foundation slab will be built.
Step 2
Prepare the Footings
Dig a trench for the
foundation footings. The depth will depend on
the type of structure the foundation is for.
Use the wooden stakes to set a level for the footings.
Step 3
Laying the Footings for Retaining Wall
Using the instructions on the bag mix the Blue Circle
Multi-Purpose Concrete and pour the mixed
concrete into the footings trench.
Step 4
Compacting and Leveling
Ensure the footings
are well compacted. Level the surface with a
straight edge. Cover and allow to cure for 7 days.
Step 5
Building the Retaining Wall
Mix Blue Circle Mortar according to the instructions on the bag.
Build up the retaining wall to the required level and
allow to cure before laying the foundation slab.
Step 6
Laying the Foundation Slab
Mix bags of Blue Circle High Strength Concrete 40N as required
for the area of the foundation slab and pour
within the retaining wall.
Level and smooth the slab surface with a trowel and straight edge.
Clean your tools promptly after finishing to prevent any material from hardening on them.
Step 7
Curing
Cover the new concrete to protect
from rain and frost and allow to cure fully before
placing or building anything on the slab.